DEPARTMENT OF PUBLIC WORKS

PO BOX 116

WEBSTERVILLE, VT 05678-0116

Phone: 476-3522 or 476-3147 (for after hour emergencies)

Hours: 7am – 3:30pm


 

Steve Blondin – Superintendent of Public Works

Scott Lamson – Assistant Superintendent

The Department of Public Works is responsible for the Town highways, sewerage system, and water distribution system. There are two mechanics that maintain eighty-plus pieces of Town equipment year round.

Summer construction maintenance and preventative measures account for much of the work. But the staff of seventeen (17) also does roadway retreatment, gravel road projects, maintenance of the compost site on Holden Road, excavation in the gravel pit for winter sand and gravel for road maintenance and construction, and many other various duties during the summer months to keep things running smoothly.

Their role in assuring all prep work (raising/lowering manholes, constructing appropriate drainage systems, and generally facilitating road project needs) is complete is invaluable in the road paving process. The post pavement work is yet another primary function of this department (i.e.: restoring driveway aprons, shoulder work, and general roadway landscape work).

In the winter, crews concentrate on keeping roadways clear and safe. During any given storm there are nine trucks out on the road plowing. Crews are often working as early as 3am to make roads safe for morning travel. The department spreads around 2000 tons of salt any given year with three different salt trucks. Ongoing work to keep the fire hydrants and bridges (Bridge Street – Snowbridge Road) clear is also necessary. Their commitment to safety and functionality of Town property and infrastructure is truly what makes this department so special.

2003 - 2007 Paved Road Schedule

2004 - 2008 Paved Road Schedule
2004 - 2008 Gravel Road Schedule